Fechar

1. Identificação
Tipo de ReferênciaArtigo em Evento (Conference Proceedings)
Sitemtc-m16b.sid.inpe.br
Código do Detentorisadg {BR SPINPE} ibi 8JMKD3MGPCW/3DT298S
Repositóriodpi.inpe.br/ce@80/2007/01.16.17.27   (acesso restrito)
Última Atualização2007:04.10.17.14.52 (UTC) administrator
Repositório de Metadadosdpi.inpe.br/ce@80/2007/01.16.17.27.41
Última Atualização dos Metadados2021:02.03.17.57.14 (UTC) administrator
Chave SecundáriaINPE--PRE/
Chave de CitaçãoPessôaLourAlve:2007:ApLePr
TítuloAn approach to lean product development planning
FormatoCD-ROM; On-line.
Ano2007
Data de Acesso06 maio 2024
Tipo SecundárioPRE CI
Número de Arquivos3
Tamanho567 KiB
2. Contextualização
Autor1 Pessôa, Marcus Vinicius Pereira
2 Loureiro, Geilson
3 Alves, João Murta
Identificador de Curriculo1
2 8JMKD3MGP5W/3C9JH57
Grupo1
2 LIT-INPE-MCT-BR
Afiliação1 Departamento de Controle do Espaço Aéreo - DECEA
2 Instituto Nacional de Pesquisas Espaciais - INPE
3 Instituto Tecnológico de Aeronáutica
Endereço de e-Mail do Autor1 mvppessoa@gmail.com
2 geilson@lit.inpe.br
3 murta@ita.br
EditorLoureiro, Geilson
Curran, Ricky
Endereço de e-Mailmvppessoa@gmail.com
Nome do EventoISPE International Conference on Concurrent Engineering, 14 (CE 2007).
Localização do EventoSão José dos Campos
Data2007, July 16-20
Editora (Publisher)Instituto Nacional de Pesquisas Espaciais (INPE)
Cidade da EditoraSão José dos Campos
Páginas223-231
Título do LivroProceedings
OrganizaçãoInstituto Nacional de Pesquisas Espaciais (INPE)
Histórico (UTC)2007-03-07 15:19:20 :: mvppessoa@gmail.com -> ce2007 ::
2007-03-29 12:42:14 :: ce2007 -> mvppessoa@gmail.com ::
2007-04-10 18:24:53 :: mvppessoa@gmail.com -> ce2007 ::
2007-04-12 21:44:13 :: ce2007 -> administrator ::
2007-05-18 15:21:20 :: administrator -> ce2007 ::
2007-05-21 19:34:36 :: ce2007 -> administrator ::
2007-12-04 15:45:55 :: administrator -> mvppessoa@gmail.com ::
2007-12-04 19:49:57 :: mvppessoa@gmail.com -> marciana ::
2007-12-06 12:02:00 :: marciana -> administrator ::
2021-02-03 17:57:14 :: administrator -> marciana :: 2007
3. Conteúdo e estrutura
É a matriz ou uma cópia?é a matriz
Estágio do Conteúdoconcluido
Transferível1
Palavras-Chavedevelopment planning
product development
lean philosophy
ResumoA product development system (PDS) is based on two pillars: "do the thing right" and "do the right thing". While the former leads to operational efficiency and waste reduction, the latter guarantees the fulfillment of all stakeholders needs. On this context, Toyota's PDS has a superior performance. The lack of formalization of the Toyota PDS system, though, makes it difficult to replicate. Research on this system has resulted in the identification of several principles, tools and techniques, but did not present a way to make them systematic. This paper aims to propose and demonstrate a systematic way to make the lean engineering products development planning. The method allows the creation of an activity network, which provides at the same time value creation and waste reduction. To achieve this objective the method is divided into four processes: (1) Value determination: having the product vision as an input, this process defines the Value Breakdown Structure VBS. The VBS differs from the usual WBS, where the latter decompose the work, to make major project deliverables or perform project phases, into smaller and more manageable chunks, and the former deploys the stakeholders' value into unequivocal and verifiable parameters, called value items. (2) Set-based Concurrent Engineering SBCE prioritization: determines the most critical product modules or organizational processes, which will be developed through a set of alternatives. During SBCE, the development team does not establish an early system level design, but instead establishes sets of possibilities for each subsystem or process, many of which are carried far into the product and process design. (3) Pull events determination: No process along the value flow should produce an item, part, service or information without direct request from the following processes. The pull events arte associated to physical progress evidences (i.e., models, prototypes, start of production, etc.) and are important moments to knowledge capture. Differently from tall gates where information batches are created, pull events guarantee the value flow, make quality problems visible and create knowledge. (4) Value creation activities sequencing: the activities to be performed are defined and sequenced based on the pull events. This work consists of three parts: (1) the identification of the needs to the lean development planning; (2) the method conception; and (4) the method evaluation against the identified needs and improvement opportunities observed on an aerospace product development example. Conclusions are that the developed method: (1) fits the product development environment; (2) adheres to the lean principles; (3) faces the traditional planning deficiencies; (4) exploits the improvement opportunities from the studied example.
ÁreaETES
TipoConcurrent innovative product engineering
Arranjourlib.net > BDMCI > Fonds > Produção anterior à 2021 > COLIT > An approach to...
Conteúdo da Pasta docacessar
Conteúdo da Pasta source
paper.doc 21/02/2007 11:09 1.1 MiB
paper.pdf 07/03/2007 12:16 179.0 KiB 
Conteúdo da Pasta agreementnão têm arquivos
4. Condições de acesso e uso
Idiomaen
Arquivo Alvopaper.pdf
Grupo de Usuáriosadministrator
marciana
mvppessoa@gmail.com
Visibilidadeshown
Permissão de Leituradeny from all and allow from 150.163
5. Fontes relacionadas
Unidades Imediatamente Superiores8JMKD3MGPCW/444BQ9E
Acervo Hospedeirolcp.inpe.br/ignes/2004/02.12.18.39
cptec.inpe.br/walmeida/2003/04.25.17.12
6. Notas
Nota1
Campos Vaziosarchivingpolicy archivist callnumber contenttype copyholder copyright creatorhistory descriptionlevel dissemination documentstage doi edition identifier isbn issn label lineage mirrorrepository nextedition notes numberofvolumes orcid parameterlist parentrepositories previousedition previouslowerunit progress project readergroup rightsholder schedulinginformation secondarydate secondarymark serieseditor shorttitle sponsor tertiarymark tertiarytype url versiontype volume
7. Controle da descrição
e-Mail (login)marciana
atualizar 


Fechar